A quieter kind of dental care.
Le Blanc Dentals opened in Kenya with a simple belief: Kenya deserved a dental atelier that treats artistry and safety as inseparable.
A partnership built for patients who expect more.
Le Blanc Dentals is the work of Dr. Robert Rutto in partnership with Carlton Group International — a collaboration formed around one ambition: to build the finest dental clinic in the region, without compromise on design, equipment or clinical standards.
Clinic development and equipment installation are now almost complete, and we open our doors before the end of this year. Every material, instrument and protocol has been chosen against a single question: would this meet the standard we would want for our own families?

Philosophy
Dentistry should feel like couture, not commerce — every plan is designed around your face, your history and your comfort, never a production line.
Standards of care
Every treatment plan begins with digital diagnostics, a full conversation, and a written estimate in KES before a single instrument is used.
Sterilisation & safety
Single-use instruments where possible, autoclave sterilisation to international standard for everything else, and a fresh setup for every patient, every time.

Led by Dr. Robert Rutto.
Founder and Principal Dentist Dr. Robert Rutto brings over a decade in private cosmetic and implant practice, with training in digital smile design and guided implant surgery. Alongside Carlton Group International, he has overseen every detail of the flagship — from suite architecture to the selection of each imaging system — and leads a resident team spanning endodontics, orthodontics and hygiene therapy.
In partnership with Carlton Group International — bringing international project, procurement and operating standards to Kenyan private dentistry.
Milestones.
From a shared idea to a finished atelier — the steps that brought Le Blanc Dentals to life.
- 012024
A partnership is formed
Dr. Robert Rutto and Carlton Group International agree to build a private dental atelier for Kenya — international standards, Kenyan heart.
- 02Early 2025
Site secured in the city centre
A flagship address in the city centre is chosen, and the clinic is designed from the ground up around digital diagnostics and patient calm.
- 03Mid 2025
Clinic build begins
Construction and fit-out of the treatment suites, sterilisation bay, imaging room and reception lounge get under way.
- 042026
Equipment installation
CBCT imaging, intraoral scanning, dental chairs and autoclave sterilisation systems are installed and commissioned — now almost complete.
- 05Q4 2026
Clinical team assembled
Resident specialists across cosmetic dentistry, endodontics, orthodontics and hygiene therapy join, trained to one shared standard.
- 06End of 2026
We open our doors
Le Blanc Dentals welcomes its first patients to the flagship — nine signature treatments, transparent pricing in KES.
